Stuffing exercise from Jakarta to Port Klang
This is the stuffing process of 100 metric tonnes of our product that is, Granular Zeolite from Jakarta to Port Klang for the month of April 2020.
This is the closed up look of the Granular Zeolite
This is the Granular Zeolite being bagged individually
The bagged Granular Zeolite is then shifted by hand into the container
Each bags is being arranged and stuffed neatly inside the container
The stuffing is done by hand, to make sure the bags are neat, tidy with no damages
The filled up container is then ready to be shipped to our buyer in Malaysia